| |
The first tunnel was discovered in November 1974,
in the Western Sector of the DMZ near Korangp'o. With an estimated
total length of 3.5 kilometers, it extends one kilometer south of
the Military Demarcation Line that divides the DMZ down the middle
along its entire stretch. The walls and ceiling of the tunnel, 1.2
meters high and 0.9 meters wide, are reinforced with concrete slabs.
Buried 0.45 meters below ground, it is capable of moving a regiment
an hour. Equipped with a narrow-gauge railway, the tunnel was lighted
with lamps connected to 220-volt power lines. Rail cars and drainage
devices were also found. This tunnel is located only 65 kilometers
north of Seoul.
|
|